| Intake, Raw Water Balancing Tank, Treatment Plant, Pumping Main, Balancing Reservoir. |
The present total capacity of the Sg Terip Stage 1 and 2 Water Treatment Plants is about 37 Mgd (168 Mld) and supplies water to Bandar Seremban, Port Dickson and Nilai. In anticipation of rapid development in the supply area, an additional phase need to be built since the present treatment plant output will not be able to meet the anticipated additional demand.
Sg Terip
Phase III WTP with 25 Mgd (114Mld) at 20 hours operation output capacity
is implemented to supplement the existing system. |
| August 1997 - 2001 | |
|
Client : Jabatan Bekalan Air Negeri Sembilan
|
|
| Cost : RM 83.0 million | |
|
Consulting Services:
|
|
![]() |