| Raw Water Pumping Station (M&E Works), Raw Water Transfer Pumping Main Outfall at Sg. Tinggi Reservoir. |
The Selangor State Gov was desirous of implementing a pumped refilling scheme for the existing Sg Tinggi reservoir so as to sustained an approximate yield of 2200 Mld for Sg Selangor at the existing Btg Berjuntai river intakes. Raw water is to be extracted from Sg Selangor when the flow is abundant and pumped into Sg Tinggi Reservoir for subsequent regulated releases back to the river. The design capacity of the raw water transfer scheme is 150 Mld and the pumping will be intermittent and during high flow periods. Raw water
intake is located at about 100 M downstream of the North-South Highway
bridge crossing The major components of the proposed scheme are:
|
| February 1999 - February 2000 (Expected Completion) | |
|
Client : Hatimuda - BJC JV Sdn Bhd (Turnkey Contractor)
|
|
| Cost : RM 75.0 million | |
|
Consulting Services:
|
|
![]() |