| Intake Works and Pumping Station, Water Treatment, Terminal Storage Tanks, Rechlorination Plant, Transmission Pipelines |
BW Perunding Sdn Bhd in association with Watson Hawksely Asia were appointed by the Turnkey Contractor as consultants for the scheme which will ultimately supply 8.3 million gallons per day of portable water from the Sg. Padas on Mainland Sabah to supplement Labuan Island's existing supply. Hydrological
studies including low flow predictions and salinity risk studies involving
extensive fieldwork and computer analysis, were conducted on the lower
reaches of the Sg. Padas in 1985 and reviewed in 1987. The scope of
work involves a river intake, raw water pumping stations, water treatment
works and a treated water pumping stations all Total length of treated wter pipeline is 51 km, of which about 25 km is a submarine. |
| 1985 - 1988 | |
| Client : Ipco - Percon JV | |
| Cost : RM 120 million | |
|
Consulting Services:
|
|
![]() |